Projects
Harlingen N31
Ballast Nedam Infra commissioned van Leeuwen to install some 1100 Leeuwanchors. Several different machines were used for this, including the Interoc, VLAB 6 and VLAB 3. Van Leeuwen's flexibility enabled quick switching between different types of anchors and installation locations. The photo shows one of the situations in Harlingen where we installed anchors.
Exxon
Ballast Nedam Industriebouw B.V. commissioned van Leeuwen, together with its foundation partners, to install some 1460 LEKA piles on a petrochemical site for a new installation in the Rotterdam Botlek area. These LEKA piles were installed under strict safety requirements and tightened rules. More than 39 km of steel tubes were drilled into the ground.
Kooyhaven
Van Leeuwen was commissioned by the de Vries and van de Wiel & Dura Vermeer consortium to install some 250 Leeuwanchors of type 76.1x17.5 and with average lengths of 27 metres. These Leeuwanchors were required for the new quay and the new area to be developed. We carried out this work using the VLAB 3. The photos show the VLAB 3 installing a Leeuwanchor. The work was completed in accordance with the preconditions and goals set.
Telecom mast foundation, Delft
Van Leeuwen installed four Leeuwanchor piles for the foundation for a telecom mast.