Van Leeuwen was commissioned by the de Vries and van de Wiel & Dura Vermeer consortium to install some 250 Leeuwanchors of type 76.1x17.5 and with average lengths of 27 metres. These Leeuwanchors were required for the new quay and the new area to be developed. We carried out this work using the VLAB 3. The photos show the VLAB 3 installing a Leeuwanchor. The work was completed in accordance with the preconditions and goals set. 

Customer Port of Den Helder
Client De Vries and van de Wiel & Dura Vermeer consortium
Location Den Helder
Activities Installing Leeuwanchors
Quantities Approx. 250 anchors
Types ø 76.1 x 17.5
Duration In 3 phases from April 2016 to October 2016